What a Bathroom Remodel Really Costs
"How much will my bathroom cost?" is the question we get most. The honest answer is that it depends on what you change. A cosmetic refresh and a full gut remodel are two very different projects, even in the same size room.

Below is how we break it down for homeowners in Goodyear, from Estrella to PebbleCreek and the neighborhoods in between. For a number specific to your bathroom, use our bathroom estimator. It takes a few minutes and gives you a starting range.
Three Levels of Bathroom Remodel
| Tier | What's included | Not included |
|---|---|---|
| Refresh | Same layout, fully refreshed: new shower tile, countertop, glass, vanity, and accessories | Toilet, curbless shower (available as an upgrade) |
| Upgrade | Curbless walk-in shower, frameless glass, quartz top, semi-custom vanity, built-in niche, new toilet | Layout changes, luxury fixtures |
| Custom | Fully custom: layout changes, natural stone, luxury fixtures, freestanding tub, 3D design | Quoted from your design |
Every project is quoted from its own defined scope.


What Changes the Price
Moving plumbing. Keeping the toilet, shower, and sink where they are is the biggest money saver. Many Arizona homes sit on post-tension slabs, which are concrete floors reinforced with steel cables under high tension. You can't cut into one freely: a specialist company first scans the slab and marks where the cables run, and only then can a drain be moved. That extra step is why remodeling or re-plumbing a home with a post-tension slab costs more. Knowing whether your home has one matters, because it decides what your bathroom layout can do. We can help you find out. Read: Do You Have a Post-Tension Slab? What It Means for Your Kitchen or Bathroom Remodel in Surprise
The shower. A custom tile shower with niches, a bench, and frameless glass costs more than a prefab surround. Curbless showers add slab work for the drain slope.
Tile. Large-format tile, intricate patterns, and floor-to-ceiling walls add material and labor. Every square foot of tile counts.
Fixtures and vanity. A thermostatic shower system or custom vanity can cost several times what a standard one does.
Electrical and ventilation. New lighting, outlets, heated floors, and a properly sized exhaust fan all add cost, but they're worth it.
Hidden conditions. Water damage or old plumbing found during demo gets fixed before we close the walls.
Who supplies the materials. Thinking about buying your own fixtures? Read our post on owner-supplied materials first. Read: Owner-Supplied vs. Contractor-Supplied Materials for Remodels in Litchfield Park
Planning to Stay Long Term?
Many Goodyear homeowners plan a bathroom they can use for years to come. A curbless walk-in shower, integrated grab bars, slip-resistant flooring, and comfort-height toilets can look high-end rather than medical. Read more in our guide to aging-in-place bathrooms. Read: Aging-in-Place Bathroom Remodels in Goodyear & PebbleCreek
How Long Does It Take?
Once design is complete, most bathroom remodels take 4 to 6 weeks on site. Every project has its own details, so during construction you'll get a Gantt chart project schedule showing each phase and what's next. Custom glass is often the last piece, measured after tile is done.
Add time before work starts if a permit is required. We'll tell you the current wait in Goodyear when we plan your project. Read: Do I Need a Permit to Remodel My Home in Buckeye?
FAQ
What's the cheapest way to update a bathroom? Keep the layout and focus on the vanity, fixtures, lighting, and paint.
Does a bathroom remodel add value? Updated bathrooms are one of the features buyers notice most, especially the primary bath.
Can I live at home during a bathroom remodel? Yes. If it's your only bathroom, we'll plan around that with you before demo starts.
Do I need a permit? Most bathroom remodels don't, unless plumbing is moved or electrical or structural work is involved. When a permit is required, we pull it, and permit fees are passed through to you. Read: Do I Need a Permit to Remodel My Home in Buckeye?
How do I know if my home has a post-tension slab? Check your home's plans or builder paperwork, look for a stamp on the garage floor (a common sign if the concrete isn't covered in epoxy), or ask us. We can help figure it out before you settle on a layout. Read: Do You Have a Post-Tension Slab? What It Means for Your Kitchen or Bathroom Remodel in Surprise
Do I need HOA approval? Interior work often needs only a notice, but exterior changes may need approval. If you live in a Goodyear HOA such as Estrella or PebbleCreek, check your rules first. Read: Remodeling in an HOA Community: Verrado, Estrella & PebbleCreek
Get Your Bathroom Estimate
Start with our bathroom estimator, then call (623) 400-2444 to talk through your design. Botello Builders, licensed ROC# 348580.
Get a starting price range in about two minutes with our bathroom estimator, then book a free 15-minute call to talk it through.
More from the blog
- Quartz vs. Quartzite vs. Granite vs. Porcelain: Which Countertop Holds Up in Arizona?
- Building a Casita in Buckeye, Goodyear or Phoenix: What Arizona's ADU Law Means for Your Lot
- Switchable Privacy Glass: Clear or Frosted at the Press of a Button
- Kitchen Remodel Cost and Timeline in Buckeye, AZ
- Updating Your Bathroom in Surprise: What to Expect
- How to Tell If a Wall Is Load-Bearing in Your Surprise Home